Project directory according to Nr.3.2 BNBest-BMBF98 <http://www.fz-juelich.de/ptj/datapool/page/490/Schlussbericht.rtf> 3 Planning and realisation of the project Work and scheduleThe
individual phases and activities of the project are detailed in fig.
1. Outdoor experiments were conducted using a plot design with 72 lysimeter pots (30 kg dry soil each), which allowed monitoring of leachate water and thus opened mass balance possibilities. The original schedule was extended on dynamical dendrotolerance/dendrotoxicity investigations with quantifiable TNT input using various glass fibre wick application systems. Financial programThe central expenditures were near below the allowance answer of 810,400 DM. Higher expenditures for staff (on the average 9 %) were compensated by savings within the other ranges. last